2011-05-03 20:10:15

Loading chiaki's kiln.
This time around I've become the unofficial leader of the firing. I rebuilt the grate system on the floor of the kiln. The old grate only went about 30 cm back and I thought making it deeper would help get oxygen more evenly distributed through the buring wood, and hopefully make it easier to get to temperature.
I also changed the way they build the door of the kiln, adding a stoking hole on the floor.
-
im looking forward to the firing and seeing the results of the changes